-
2017
In 2017, it cooperated with Nantong Jianghai capacitor Co., Ltd. to establish Tianjin Baina Energy Technology Co., Ltd.
-
2014
In 2014, it cooperated with chaogong group and set up a super capacitor R & D center in Shenzhen.
-
2009
In July 2009, it moved to "Liaoning super capacitor industrial base" in Chaoyang City, Liaoning Province, and changed its name to Liaoning Baina Electric Co., Ltd.
-
2007
Since September 2007, it has signed a contract with Maxwell company of the United States, becoming its authorized technology integrator in China.
-
2006
In March 2006, Jinzhou Baina Electric Co., Ltd. was established on the basis of the former Jinzhou Fuchen company according to the market demand, specializing in the manufacture and application development of super capacitor energy storage module and energy storage device.
-
2002
In 2002, it realized commercial production and was transformed into Jinzhou Fuchen super capacitor Co., Ltd. according to the national policy.
-
2001
In 2001, Jinzhou Jinrong super capacitor Co., Ltd. was established, which belongs to Jinzhou power capacitor Co., Ltd.
-
1998
In 1998, Jinzhou Jinrong super capacitor Co., Ltd. was established, which belongs to Jinzhou power capacitor Co., Ltd.